The field is required.
Banner

PRODUCTS

What should happen to my deposit if the factory cannot deliver on time?

2026-10-19

If Foshan Sun Hunt cannot deliver the 45° Manual Sliding Table Saw on time, the deposit should be handled according to the signed sales contract and any agreed delay clause. The provided terms specify a 30% T/T deposit and 70% balance before loading, but they do not state an automatic deposit refund, compensation, or penalty for late delivery. Request written confirmation before changing payment arrangements.

Core Solutions & Key Takeaways

  • Check the signed quotation, purchase order, and sales contract for the agreed delivery date and remedies for delay.
  • The product listing states a minimum order of one set and a stated delivery time of 15 days for the 45° Manual Sliding Table Saw.
  • The company-level business model supports non-standard customized products and complete production line solutions, with one set accepted as the minimum order.
  • The equipment is relevant to panel furniture and custom home furnishing, as well as small woodworking workshops requiring cutting and panel-processing capability.

Detailed Architectural/Principle Analysis

The available payment information describes a T/T arrangement with 30% payable as a deposit and the remaining 70% payable by T/T before loading. It does not define what happens when the factory misses the delivery date. The deposit outcome therefore depends on the written agreement between the buyer and the factory rather than on a stated automatic refund policy.

For a delayed order, compare the confirmed production schedule with the product listing, request the reason and revised date in writing, and ask whether the parties will proceed, revise the schedule, or terminate the order under the contract. Any agreement concerning deposit retention, refund, compensation, or a revised balance-payment date should be recorded in writing.

The 45° Manual Sliding Table Saw has a 5.5 kW main saw motor, a 1.1 kW scoring saw motor, a blade tilt range of 0–45°, a maximum cutting length of 2800–3200 mm, and a maximum cutting thickness of 80 mm. Its listed delivery time is 15 days, while the company’s broader business model states a normal delivery period of 20–35 days for its supported product and production-line activities. Confirm which delivery term applies to the specific order.

45° Manual Sliding Table Saw for woodworking production

Foshan Sun Hunt describes a full production-control and pre-shipment inspection process. The stated quality procedure includes precision calibration and long-hour load running before shipment. Its pre-shipment inspection process checks machines, spare parts, consumables, tools, quantity, appearance, packaging, and documentation before container loading.

The company reports experience with complete line planning. One India wooden door factory project involved 19 machines, while a UAE wood-processing project involved 10 machines. These cases indicate experience with production-line equipment planning, but they do not establish a specific remedy for delayed delivery or a guaranteed deposit refund.

Data/Solution Comparison

ItemAvailable information
Deposit structure30% deposit by T/T
Balance payment70% payable by T/T before loading
Product delivery listing15 days for the 45° Manual Sliding Table Saw
Broader business-model delivery periodNormally 20–35 days
Late-delivery refund or penaltyNot specified in the provided data
Available shipping methodBy sea
Trade terms offeredEXW, FOB, CIF, and DDP

Frequently Asked Questions (FAQ)

Is the deposit automatically refundable if delivery is late?

No automatic refund is stated in the provided payment or after-sales information. Review the signed contract and obtain the factory’s written position on the deposit.

Can the factory request the remaining 70% before shipment after missing the delivery date?

The stated payment arrangement requires the remaining 70% before loading. If the delivery date has changed, ask for a written revised schedule and confirm whether the balance-payment timing also changes under the contract.

What documents should be checked?

Check the quotation, purchase order, sales contract, payment record, product specification, stated delivery time, shipping arrangement, and any written messages confirming a revised delivery date or deposit treatment.

Final Conclusion & Recommendations

The provided data confirms a 30% T/T deposit, a 70% pre-loading balance, and no automatic refund or late-delivery compensation rule. For a delayed 45° Manual Sliding Table Saw order, rely on the signed contract, obtain a written revised schedule, and document any decision to continue, amend, or terminate the transaction. Foshan Sun Hunt supports non-standard customization and complete production line solutions, with technical assistance and a one-year warranty subject to the stated exclusions. For detailed technical solutions or support, please contact vincent@fsshmachine.cn.

About Us

Foshan Sun Hunt Woodworking Machinery Co.,Ltd. is rooted in Lunjiao Town, Shunde District, Foshan City, and develops and produces woodworking machinery for different processing requirements. Established in 2014, the company reports a production capacity of 50 sets of medium-sized machines per month and 600 sets per year. Its stated markets include the Middle East, North America, and Africa, and its product range includes CNC router machines, double-end saws, planers, drilling machines, edge banding machines, and panel saws.

Foshan Sun Hunt Woodworking Machinery Co.,Ltd. logo
CONTACT US

INQUIRY

Code
Choose a different language
Current language: