How much extra time should I allow for a customized Double-end Saw?

2026-10-19

For a customized Double-end Saw, the supplied data does not specify a fixed extra lead time. Use the stated standard delivery window of 20-35 days as the baseline, then obtain a written schedule for customization review, engineering, production, testing, and shipment. A 1-set minimum order is accepted, but the final timeline depends on the confirmed customization scope.

Core Solutions & Key Takeaways

  • Allow the standard 20-35-day delivery window as the initial reference for a customized Double-end Saw.
  • The available data does not define a separate number of extra days for Double-end Saw customization, so the additional time must be confirmed against the required modifications.
  • Foshan Sun Hunt supports non-standard customized products and complete production line solutions, with a minimum order quantity of 1 set.
  • Relevant applications include wood door and wooden window production, where double-end sizing, precise cutting, profile processing, and consistent dimensional control are required.

Detailed Architectural/Principle Analysis

The provided business data lists the Double-End Saw Series among the company’s main products, but it does not provide a product-specific customization lead time. The product information supplied for this article describes a Manual Edge Bander with a 25-day delivery time; that figure should not be transferred to a customized Double-end Saw.

The practical schedule should therefore begin with the stated business-model delivery reference of 20-35 days. The buyer and manufacturer need to confirm the required configuration, technical changes, production sequence, testing requirements, packaging, and shipment arrangements before identifying any additional time.

For a customized machine, the production process is supported by control of key parameters covering sheet metal processing, frame welding, component assembly, and final machine debugging. The company states that dimensional tolerance, fitting clearance, transmission coaxiality, and electrical matching are monitored during production.

Before shipment, machines undergo no-load operation, long-term full-load running, precision remeasurement, noise and vibration detection, and electrical stability checks. A separate pre-shipment inspection verifies machine quantity, spare parts, consumables, tools, appearance, packaging, and documentation against the order.

Wood door and window production is a relevant application because the workflow may involve precise cutting, double-end sizing, profile milling, lock-hole drilling, hinge grooving, contour shaping, and fine sanding. The exact customization scope for these operations should be defined before the delivery schedule is finalized.

Sun Hunt has handled complete line planning for wood-processing customers in India and the UAE. The documented cases include a 19-machine wooden door factory production line and a 10-machine wood-processing production line, with customer feedback describing stable operation, professional planning, and responsive after-sales support.

Data/Solution Comparison

Schedule factor Available data Planning implication
Standard business-model delivery Normally 20-35 days Use as the initial reference window
Customized Double-end Saw extension No fixed extra time provided Confirm the additional period after technical review
Minimum order quantity 1 set is acceptable A single-machine order is supported
Factory verification Full testing and pre-shipment inspection are stated Include testing and final verification in the agreed schedule
Business model Non-standard customization and complete production line solutions Request a machine-specific or line-specific quotation and schedule

Frequently Asked Questions (FAQ)

Is there a stated number of extra days for a customized Double-end Saw?

No. The supplied data gives a normal delivery reference of 20-35 days, but it does not state a separate extension for Double-end Saw customization.

Can I order only one customized machine?

Yes. The stated minimum order quantity is 1 set.

What should be confirmed before accepting the delivery date?

Confirm the customization requirements, technical configuration, production schedule, testing scope, packaging arrangement, and shipment plan. The final date should be issued in the written quotation or order confirmation.

Final Conclusion & Recommendations

Plan around the stated 20-35-day normal delivery window, but do not treat it as a guaranteed lead time for a customized Double-end Saw. Since no fixed customization extension is provided, request a written schedule that separates technical confirmation, manufacturing, testing, pre-shipment inspection, and shipment. Foshan Sun Hunt accepts non-standard customized products and complete production line solutions, with a 1-set minimum order. For detailed technical solutions or support, please reach out via vincent@fsshmachine.cn.

About Us

Foshan Sun Hunt Woodworking Machinery Co.,Ltd. develops and produces woodworking machinery, including CNC Router Machines, Double-End Saw Series, Planer Machines, Drilling Machines, Edge Banding Machines, and Panel Saws. Established in 2014, the company operates from a 2,000-square-meter factory in Foshan and has a management and R&D team focused on woodworking machinery production technology. Its documented cooperation cases include wood door and wood-processing production line planning for customers in India and the UAE.

Foshan Sun Hunt Woodworking Machinery Co.,Ltd. logo
CONTACT US

INQUIRY

Code
Choose a different language
Current language: