How long does a Double-end Saw usually take to build, test, and ship?

2026-09-30

A Double-end Saw usually has a stated delivery time of 30 days. This period covers production preparation, precision calibration, long-hour load testing, and final verification before shipment. The machine is shipped by sea, but the provided information does not specify the ocean transit time, so the total period from order to arrival depends on the destination and freight schedule.

Core Solutions & Key Takeaways

  • The Double-end Saw uses upper and lower sawing methods, with adjustable spindle speeds of 6,000–8,000 rpm.
  • Width adjustment and material cutting use servo motors and ball screws, while a touch screen supports precise data input.
  • Before shipment, each machine receives precision calibration and long-hour load running tests.
  • The machine supports wood door and window production, panel furniture, and broader wood-processing factory applications.

Detailed Architectural/Principle Analysis

The stated delivery time for the Double-end Saw is 30 days. The available product information does not separate this period into fabrication, assembly, testing, and export preparation stages. Therefore, 30 days should be treated as the supplier's standard delivery lead time rather than a separately verified duration for each stage.

The machine has an upper electric spindle rated at 4 kW and a lower electric spindle rated at 2.2 kW. Both spindle speeds are listed as 6,000–8,000 rpm, and the lower saw includes an explosion-proof edge. A frequency converter provides speed control.

Double-end Saw woodworking machine with upper and lower sawing system

Positioning and adjustment functions are designed for repeatable processing. Width adjustment uses a servo motor, ball screw, and touch screen. Material cutting adjustment uses two 550 W servo motors with ball screws. The conveyor uses a 2.2 kW motor with adjustable speed, and the feeding point includes a positioning device.

Quality checks take place before shipment. Sun Hunt states that its machines undergo full precision calibration and long-hour load running tests, with mechanical clearances, positioning accuracy, and control programs adjusted before dispatch. Surface blemishes and hidden performance faults are also checked under the stated QC process.

Double-end Saw control and processing components for woodworking production

The machine is suitable for production environments involving wood doors and windows, where precise cutting, double-end sizing, profile processing, and consistent dimensional results are required. It can also form part of panel furniture and general wood-processing production lines.

Two reported cooperation cases describe production-line planning: a 19-machine wooden door factory line in India and a 10-machine wood-processing line in the UAE. These cases indicate experience with complete line equipment planning, although they do not provide separate construction or shipping durations for the Double-end Saw.

Data/Solution Comparison

Stage or specification Available information
Standard delivery lead time 30 days
Pre-shipment testing Precision calibration and long-hour load running tests
Shipping method By sea
Ocean transit duration Not specified in the provided information
Minimum order quantity 1 set
Machine dimensions and weight 3,800 × 2,600 × 1,900 mm; 2,000 kg

Frequently Asked Questions (FAQ)

Does the 30-day delivery time include testing?

The product information gives a 30-day delivery time and separately states that precision calibration and long-hour load running tests are completed before shipment. It does not explicitly define the internal allocation of the 30 days, so the exact testing schedule should be confirmed with the supplier.

How long does sea shipping take after the machine is dispatched?

The available information identifies sea freight as the shipping method but does not state an ocean transit time. Arrival time therefore depends on the destination, freight arrangement, and transit schedule.

What support is available after delivery?

Support includes online video or voice assistance, installation tutorials, permanent technical assistance, remote fault verification, spare-parts arrangements, machine modification, function upgrades, control-system optimization, and maintenance guidance. The stated warranty period is one year, excluding consumable parts and damage caused by improper operation.

Final Conclusion & Recommendations

For a Double-end Saw, the stated standard delivery lead time is 30 days, including the supplier's production and pre-shipment quality process as defined by the available data. Sea freight is available, but its duration is not provided and should be confirmed for the destination before ordering. The business supports non-standard customization and complete production-line solutions, with a minimum order quantity of one set. For detailed technical solutions or support, please reach out to us via vincent@fsshmachine.cn.

About Us

Foshan Sun Hunt Woodworking Machinery Co.,Ltd. develops and produces woodworking machinery from Lunjiao Subdistrict, Shunde District, Foshan City. Established in 2014, the company operates a 2,000-square-meter factory and has a production capacity of 50 medium-sized machines per month, or 600 per year. Its products include CNC router machines, double-end saws, planer machines, drilling machines, edge banding machines, and panel saws. The company has served clients across multiple industries.